Labeling and Signage Checklist for Opening a New Warehouse or Plant
This checklist is for teams bringing a new building online. Rack labels, aisle signs, and floor marking all depend on one finished location plan, so lock that plan first and check the data before anything prints. The rest follows in order: materials, signs, floor marking, the install, and a scan test before inventory arrives. Country Innovation & Supply (CIS) is based in Winder, Georgia, and works with Atlanta and Georgia facilities. Print this page, hand it to your project team, and work down the list.
The checklist in seven steps
- Finalize the location naming convention
- Build the location file and check it before printing
- Choose rack label materials by zone and scan distance
- Plan aisle signs and overhead signage
- Lay out floor marking for traffic, staging, and safety
- Coordinate the install with the rack schedule and WMS go-live
- Scan-test every location before inventory arrives
Keaton replies the same business day.
Same-day quotePhase 1. Lock the location plan
Every label, sign, and WMS location comes from the same plan. Change the plan after printing and you pay for the labels twice.
Pick a naming convention and write it down
Decide the order of the fields: zone, aisle, bay, level, position. Use fixed-width fields with leading zeros, so aisle 1 is 01 and every code is the same length. Decide which side of each aisle is odd and which is even, and which way numbers run along the direction of travel. Put all of it in a one-page document your team and your suppliers work from. Our warehouse rack labeling best practices guide goes deeper on naming.
Leave room to grow
Reserve aisle and bay numbers for rack you plan to add later. Expansion is much easier when the new aisles already have numbers waiting for them.
Confirm the barcode format with your WMS
Ask your WMS team which barcode symbology to use, which characters are allowed, the maximum code length, and whether you will use check digits. Get the answer in writing before the label design starts.
Phase 2. Build the location file and check it before printing
The location file is a list of every location code you will label. It usually comes from a WMS export, a slotting tool, or the rack drawings. If you don't have a file yet, CIS can build it from your rack drawings, as described in our warehouse label installation guide.
Before anything prints, check the file for the usual problems: duplicate codes, gaps in the sequence, inconsistent formats, lost leading zeros, and arrows or levels that don't match the rack. Our guide on how to check warehouse label data before printing walks through each one.
CIS can run your location file through the CIS Label Data Validator, which runs 16+ automated checks before production. For Zion Solutions Group, a supply chain automation integrator, running their location data through the CIS Label Data Validator before print caught errors that would have meant about $15,000 in reprints.
Phase 3. Rack labels
Rack labels take the most abuse in the building. Pick them zone by zone, not as one order for the whole site.
Match material and adhesive to each zone
Ambient, freezer, outdoor, and wash-down areas each need the right face stock and adhesive. Freezer zones need a freezer-grade adhesive or a magnetic backing. The Warehouse Label and Sign Selection Matrix shows which label goes where.
Size labels for scan distance
Put long-range retro-reflective labels on upper beams, where operators scan from the floor or a lift. Plan on 10+ feet scan distance (typical for a long-range scanner). They are built for long service life. Standard labels work at pick level and on shelving, where scans happen at close range.
Write a placement standard
Choose one mounting height and position for each beam type and write it down for the installers. Labels that sit in the same spot on every beam are faster to find and faster to scan.
Phase 4. Aisle signs and overhead signage
Signs tell people where they are before they ever scan a label, so plan them alongside the rack labels.
Plan aisle end signs that show the aisle number and bay range, hanging signs for bulk floor storage, dock door signs, and zone signs for receiving, staging, returns, and quarantine. Make the signs and labels follow one visual scheme, with the same numbering, colors, and fonts, so the building reads as one system.
Phase 5. Floor marking and safety lines
Floor marking keeps forklifts and people apart and shows where product belongs.
Mark aisles and pedestrian walkways, forklift lanes, staging areas, keep-clear zones, and bulk floor locations. OSHA requires permanent aisles and passageways to be appropriately marked. It does not require one specific color, and an OSHA interpretation letter says marking lines should be at least 2 inches wide. Check current OSHA guidance for your facility.
Choose tape or paint based on forklift traffic, and prep the floor before anything goes down. Marking applied to a dirty or sealed floor won't last.
CIS supplies floor labels and floor marking materials as part of a labeling project. Tell us what your floor plan calls for and we will quote it.
Phase 6. Coordinate with the rack install and WMS go-live
Labels go on last, but they have to be planned first.
Rack labels go on after the beams are set, inspected, and safety-cleared. Work back from your go-live date: data, proof, production, install, scan test. Agree who owns each step: operations, IT or the WMS team, the rack integrator, and the labeling supplier. Load the WMS locations from the same checked file the labels were printed from.
CIS offers project-managed installation. Share your go-live date and we will lay out an install plan for your building.
Phase 7. Scan-test before inventory arrives
The last step is to prove every location works before product moves in.
Scan every location with the scanners your team will actually use, or start with one full aisle, and confirm each scan matches the WMS record. Then run a full receive, putaway, pick, and ship dry run. If you need scanners for the test, see our barcoding equipment.
The full checklist (printable)
| Phase | Item | Owner | Done |
|---|---|---|---|
| Phase 1. Lock the location plan | Naming convention documented | ||
| Phase 1. Lock the location plan | Barcode format confirmed with the WMS team | ||
| Phase 1. Lock the location plan | Check digit decision made | ||
| Phase 2. Build the location file and check it before printing | One master location file | ||
| Phase 2. Build the location file and check it before printing | File checked for errors | ||
| Phase 2. Build the location file and check it before printing | Proof approved | ||
| Phase 2. Build the location file and check it before printing | Pilot labels printed and scanned | ||
| Phase 3. Rack labels | Material and adhesive chosen for each zone | ||
| Phase 3. Rack labels | Label size chosen for each level | ||
| Phase 3. Rack labels | Placement standard written | ||
| Phase 4. Aisle signs and overhead signage | Sign schedule built by location | ||
| Phase 4. Aisle signs and overhead signage | Mounting method chosen | ||
| Phase 4. Aisle signs and overhead signage | Sign scheme matches the rack labels | ||
| Phase 5. Floor marking and safety lines | Traffic plan drawn | ||
| Phase 5. Floor marking and safety lines | Color legend documented | ||
| Phase 5. Floor marking and safety lines | Floor prepped | ||
| Phase 5. Floor marking and safety lines | Markings applied | ||
| Phase 6. Coordinate with the rack install and WMS go-live | Install window booked after rack sign-off | ||
| Phase 6. Coordinate with the rack install and WMS go-live | WMS locations loaded from the same checked file | ||
| Phase 7. Scan-test before inventory arrives | Every location scanned | ||
| Phase 7. Scan-test before inventory arrives | Mismatches fixed | ||
| Phase 7. Scan-test before inventory arrives | Signs and floor marking walked |
Opening a facility in Atlanta or North Georgia?
New industrial buildings keep coming online across metro Atlanta and along the I-85 and I-75 corridors. CIS is based in Winder and works with facilities across metro Atlanta and North Georgia. One team covers rack labels, signs, floor marking materials, and the data check. See warehouse rack labels in Atlanta and Georgia, or browse our warehouse barcode labels and material handling supplies.
15+ years in business | 500+ clients | 10K+ products delivered
Already operating? Audit your labeling.
Same-day quoteWhat to send CIS for a new facility quote
- Floor plan
- Rack drawings or a location file
- Approximate number of rack locations
- Freezer, cold, or outdoor zones
- WMS and scanner type
- Target go-live date
Our pre-quote questionnaires cover the details. Send what you have now and the rest later.
Frequently asked questions
What labeling do you need before opening a new warehouse?
Rack location labels, aisle and zone signs, dock door signs, floor marking for traffic and staging, and a checked location file that matches your WMS.
When should rack labels be installed in a new building?
After the rack is installed, inspected, and safety-cleared, and after the location file is checked. Leave time to scan-test before inventory arrives.
What should come first, labels or the WMS setup?
The location naming convention. The WMS locations and every label are built from the same checked file.
Does OSHA require a specific floor marking color?
No. OSHA requires permanent aisles and passageways to be appropriately marked but does not mandate one color. Check current OSHA guidance for your site.
How do I avoid reprinting rack labels?
Check the location file before printing for duplicate codes, sequence gaps, format errors, and lost leading zeros, then scan a pilot set before full production.
Can one supplier handle labels, signs, and floor marking?
Yes. CIS supplies rack labels, aisle and dock signs, and floor labels and marking materials, and can run your location file through the CIS Label Data Validator before production.
What should I send for a new facility labeling quote?
Your floor plan, rack drawings or a location file, an approximate location count, cold or outdoor zones, your WMS, and your go-live date. CIS replies the same business day.